Pre-Construction Value Engineering

The greatest opportunity to influence the cost, buildability and programme of a groundworks package is before construction starts.

01
Infrastructure ahead.
02
Drainage sequenced.
03
Plots released.
04
Access maintained.
05
Externals progressed.
01

Early Engagement.

02

Better Engineering.

03

Greater Cost and Programme Certainty.

Early engagement allows IronRock to interrogate the engineering design before it becomes a site constraint.

We have our own established design, consultancy and commercial teams, enabling us to work collaboratively from the earliest stages of a project. Equally, we are experienced in working alongside a client’s appointed engineers, consultants, quantity surveyors and wider design team.

OUR TEAMS
Design · Consultancy · Commercial
OR ALONGSIDE YOURS
Engineers · Consultants · Quantity surveyors · Design team
OUR PRE-CONSTRUCTION REVIEW

Our pre-construction review considers the complete groundworks strategy, including:

Drainage & water
  • Drainage design, depths and gradients
  • Foul and surface water strategy
  • Attenuation and SuDS
Ground & structures
  • External levels
  • Earthworks modelling and cut/fill balance
  • Foundation solutions
  • Retaining structures
  • Temporary works
  • Ground improvement
Roads & infrastructure
  • Road construction
  • Adoptable infrastructure
  • Material specifications
  • Utility interfaces
Delivery & commercial
  • Construction methodology
  • Site logistics and access
  • Plant strategy
  • Sequencing and phasing
  • Programme
  • Commercial risk
VALUE ENGINEERING

We actively challenge design where an alternative solution can:

Improve buildability
Reduce excavation
Simplify temporary works
Reduce material movements
Shorten the programme

We actively challenge design where an alternative solution can improve buildability, reduce excavation, simplify temporary works, reduce material movements or shorten the programme.

Early contractor involvement also allows construction methodology to inform design decisions before they are fixed — particularly on technically challenging sites involving deep drainage, significant level changes, complex attenuation, retaining structures or constrained access.

Our commercial team works alongside our engineers and operational teams to test solutions against both cost and programme.

THE OBJECTIVE IS SIMPLE:
01
Resolve risk in pre-construction.
02
Engineer out unnecessary cost.
03
Establish a buildable groundworks strategy before mobilisation.
AT DESIGN OR TENDER STAGE?

Send us your drawings before the design is fixed.

GET IN TOUCH

Book a pre-construction review with our design and commercial teams.

If you’ve got questions or ideas you would like to share, send a message. For anything more specific, please contact us!

Phone Enquiries

Our Email

Let’s Talk About Your Project

After we get some information from you, we’ll set up a time to discuss your project in further detail.